Switchboard Equipment for Main Water Supply

14/08/2024

This is one of those projects that leave a mark not only in the energy landscape of the country, but also have the challenge of engineering.

Such objects are interesting, make you "sweat," but it's a real hobby.

Therefore, we are glad that the EDS Power team was involved in this large-scale project, which not only demonstrates our engineering capabilities, but also makes a significant contribution to ensuring a stable water supply in the region. This is a real challenge that combines the experience, knowledge and innovative solutions of our team. We are proud to be able to contribute to the restoration of infrastructure and support of vital systems, ensuring reliability and efficiency.

Equipment providing energy at this facility:

  • Complete switchgears 35 kV KRP F-40.5
  • Complete switchgears KRP F-7.2
  • Distribution boards
  • CSR type single-sided service collection chambers
  • Modular complete transformer substations in reinforced concrete housing
  • Complete transformer substation
  • F-Control alarm, remote control and video surveillance cabinets
  • Relay protection and automation cabinets RPA
  • SHOC operational current cabinets
  • Auxiliary cabinets
  • C-Box cabinets
  • Lighting boards
  • NF clamps boxes

We are confidently moving forward, ensuring sustainable development and strengthening of the energy infrastructure of our country.